Lime Slaker Heating

A power plant was looking to improve their lime slaking process for flue gas desulphurization and cleaning. They needed to:

  • Instantly meet and maintain precise temperature control for proper mixing of slurry
  • Increase production with reduced cycle times
  • Reduce energy costs

Design Conditions

Water Flow Rate: 80-110 gpm
Water Inlet Temperature: 33-75°F
Water Outlet Temperature: 80-95°F
Water Inlet Pressure: 60 psig
Steam Pressure: 135 psig


For more EZ Heater product and design information, please click here.

Hydro-Thermal Solution

Hydro-Thermal’s EZ Heater model H2020
An H2020 EHS Systems for the Slaker water heating process .Installation of the unit has proven the inherent advantages of its design.

♦ Better product quality with precise temperature control
♦ Instantaneous hot water on demand with adjustable flow rates
♦ Increased production due to faster product heating
♦ 28% time and energy savings compared to previous heating technologies
 

Click here to download an Adobe Acrobat document containing this case study information.
 
 
Contact: 800.952.0121 | 262.548.8900