A power plant was looking to improve their lime slaking process for flue gas desulphurization and cleaning. They needed to:
- Instantly meet and maintain precise temperature control for proper mixing of slurry
- Increase production with reduced cycle times
- Reduce energy costs
Water Flow Rate: 80-110 gpm
Water Inlet Temperature: 33-75°F
Water Outlet Temperature: 80-95°F
Water Inlet Pressure: 60 psig
Steam Pressure: 135 psig
For more EZ Heater product and design information, please click here.
An H2020 EHS Systems for the Slaker water heating process .Installation of the unit has proven the inherent advantages of its design.
♦ Better product quality with precise temperature control
♦ Instantaneous hot water on demand with adjustable flow rates
♦ Increased production due to faster product heating
♦ 28% time and energy savings compared to previous heating technologies |
|
|